![]() He said the likelihood of this material migrating to the West River and the wetlands “was a little far-fetched.” ![]() He said there is no need to do that as plants at the seams of the turf can be removed with “vinegar and water.”Īs for water being contaminated by bits of synthetic turf, McDermott said there is a perimeter drain designed to capture any runoff in drop boxes with screens in them. McDermott said Yale does not use Monsanto’s Roundup to remove plants on its existing synthetic fields. He said this is dealt with by applying a laundry softener through a sprayer. McDermott said what happens sometimes in the early life of the rubber material is that there is static cling. Bloodstains from an injured player would be spot treated with a disinfectant. He said generically, the material does not require chemical treatments. He said this particular product does not require a lot of water or an irrigation system. Vincent McDermott, senior vice president of Milone and MacBroom, answered the environmental questions that Laura Cahn, a concerned citizen and chairwoman of the New Haven Environmental Advisory Council, sent to the commission in a letter. The university wants to start the work in September so the field can be ready for the spring season. When it rains, a Yale official said games will be able to resume more quickly because of the permeability of the surface, It was determined that synthetic turf drains better than natural turf and will also be easier to clear when it snows. Yale will remove the existing natural turf and put in the new turf and a chain-link fence. The university is putting in synthetic turf at the DeWitt Family Field and the Johnson Field off Central and Derby avenues in Westville in order to upgrade the playing surface for women’s softball. ![]() The renovation is expected to start in early 2018 and be completed by June 2019.Ī second Yale project on the City Plan agenda also was approved in record time. To deal with stormwater management issues, Yale will construct three bioswales within the city’s right-of-way adjacent to the property. The proposed project is an interior-only renovation with no changes proposed to the site at the corner of York and George streets. Mayes said the new arrangement will be much more patient-centered. The additional space in the three-story, 119,000-square-foot building will be used for laboratory space by the medical school. Mayes said the new location will be easier for parents and children with services, clinical labs and support offices all in one location. The center is now spread over three buildings: 230 South Frontage Road, 100 York St. “We are pushing for space,” Mayes told the City Plan Commission Wednesday night, which approved the new use of the downtown building near the Yale Medical School. Mayes, director of the the center, said it grew 10 percent last year, and that growth is expected to continue.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |